1915Çanakkale Bridge and Motorway Project comprises 89 km of motorway including the 1915Çanakkale Bridge and 12 km of access roads stretching between Malkara and Çanakkale. The Project constitutes a segment of the 325-km-long Kınalı-Tekirdağ-Çanakkale-Savaştepe Motorway Project.

The Project route passes by the southern tip of the Malkara settlement and the western border of Şarköy, then turns towards the southwest and reaches the Gelibolu Peninsula via the eastern part of Evreşe. Passing through the northern end of Gelibolu, the Motorway reaches the region of Umurbey on the Asian shore via the 1915Çanakkale Bridge located between Sütlüce in Europe and Lapseki in Asia.

Besides the 1915Çanakkale Bridge, the project also includes the construction of 2 concrete viaducts, 12 junctions (including those on the state road), 12 bridges, 43 overpasses (including 1 ecological overpass), 40 underpasses, 235 culverts, 4 motorway service areas, 2 operation and maintenance centers, 5 toll plazas.