To be used as the working platform to aid the erection of the main cable, the catwalk’s construction started in September.

Construction of the Catwalk Starts at the 1915Çanakkale Bridge

For the construction of the catwalk, a guide wire was hoisted into place between the anchorage blocks on the Asian and European shores.