Construction of the Catwalk Starts at the 1915Çanakkale Bridge
To be used as the working platform to aid the erection of the main cable, the catwalk’s construction started in September.
![Construction of the Catwalk Starts at the 1915Çanakkale Bridge](/cmsfiles/news/construction-of-the-catwalk-starts-at-the-1915canakkale-bridge.jpg?v=56)
For the construction of the catwalk, a guide wire was hoisted into place between the anchorage blocks on the Asian and European shores.